File:Greenhouse at Felton Park 350.jpg
The wrought-iron greenhouse at Felton Park. The greenhouse was erected in two phases, probably in the 1830s. Photo by Edward Diestelkamp. Source: The wrought-iron greenhouse at Felton Park in the Institute of Historic Building Conservations (IHBCs) Context 177, published in September 2023, written by Edward Diestelkamp, who teaches for NYU London in the MA programme historical and sustainable architecture. https://ihbconline.co.uk/cont_arch/?p=1452 Not for re-use.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 06:59, 11 February 2024 | 350 × 181 (32 KB) | Designing Buildings (Talk | contribs) | (The wrought-iron greenhouse at Felton Park. The greenhouse was erected in two phases, probably in the 1830s. Photo by Edward Diestelkamp. Source: ‘The wrought-iron greenhouse at Felton Park’ in the Institute of Historic Building Conservation’s (IHBC) |
- Edit this file using an external application (See the setup instructions for more information)
File usage
There are no pages that link to this file.
Metadata
Featured articles and news
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.